11.13.5. Preparation


Jo now:


  • Checks the Charity Commission guidance for any restrictions on what Green are proposing to do
  • Informs Green’s solicitor what they are proposing. The solicitor advises offering a specific type of lease which will enable Green to take the space back at the end of the lease if they want it
  • Agrees the solicitor’s fees and other costs
  • Prepares a plan and timetable for moving staff, furniture and IT equipment etc., to the ground floor
  • Agrees fees with the building surveyor, and instructs them to proceed with the improvement work as soon as the move to the ground floor is complete
  • Agrees fees with the agent and instructs them to prepare to market the space as soon as it is ready
  • Collates electronic copies of all of the available building information into a single folder and sends a copy to the solicitor
  • Checks and confirms that the building has a valid Energy Performance Certificate (EPC) with an acceptable rating